High Level Inspection and De-Scaling

Road2Rail Access were contracted in to carry out de-scaling of any loose material which has a serious impact on falling on to the live highway below.

We assisted an Engineer in accessing the 20m high face using our trained Technicians. Large and dangerous leaning trees were also removed to prevent any future damage.